Serving Greater North Richland Hills

Hardwood Stairs

Tread and riser installation, carpet removal and staircase refinishing that matches the species, sheen and nosing profile of your floor.

North Richland Hills Wood Flooring builds and refinishes hardwood stairs across North Richland Hills, TX, serving surrounding cities including Watauga, Hurst, Haltom City, Colleyville and Bedford. Stairs are the part of a wood flooring job most contractors quote last and least carefully, and they are the part a visitor looks at first, because a staircase is at eye level and a floor is not.

They are also joinery rather than surface area, which is why they are priced per step and per flight. Every step is a tread, a riser, a nosing and often a return, each cut to a run that is rarely square from top to bottom. Winders, landings, open sides, skirt boards and balustrade work each carry their own labor, and none of that is visible to a square footage number.

The other thing that makes stairs different is that they are usually the only route between floors, so the work has to be staged around a household that still needs to get upstairs. We agree that staging before the schedule is set, and where the house was built before 1978 the lead-safe setup for painted risers, stringers and balusters goes up as part of the same plan rather than partway through it.

Anatomy of a Wood Staircase

Carpenter lowering a bullnosed white oak retro tread onto an exposed stair stringer in a North Richland Hills house.

Treads, Risers and Nosing Profiles

The tread is the surface you step on, the riser is the vertical face between steps, and the nosing is the shaped front edge that projects over the riser below. A tread is thicker than a flooring board, so it is milled or built up rather than cut from the same product. The nosing profile decides whether the edge reads as a continuation of the floor or as a change of material.

Stringers, Skirt Boards and What Is Behind the Drywall

Stringers are the sawtooth members carrying the treads, and on a carpeted staircase they are usually construction-grade lumber that was never intended to be seen. A skirt board is the finished board running along the wall side, and fitting one to an existing flight is fine scribing work. What we find behind the drywall on an open side changes the scope, so we look before quoting.

Balusters, Newel Posts and Handrail

The balustrade is a separate system from the treads and gets its own decision: refinish in place, replace the balusters while keeping the newel posts, or rebuild the whole assembly. Iron balusters into wood treads, painted wood balusters and stained wood all age differently. Refinishing these with the treads is what stops a new staircase from looking half done.

Carpeted Stairs Coming Out

What Is Under the Carpet

We pull the carpet back at one step before quoting anything. Sometimes there is oak underneath in refinishable condition, which is the cheapest good outcome available. More often there is framing lumber, staple damage and tack strip holes, which points toward retrofit treads or full replacement. Either way the answer comes from looking rather than from assuming what a builder did.

Retrofit Treads Against Full Replacement

A retrofit tread caps the existing step with a finished surface, which is faster, disturbs less and works where the underlying structure is sound and the rise and run are consistent. Full replacement removes tread and riser back to the stringer, which is what an uneven or damaged flight needs. We measure rise and run at every step, because inconsistency is what rules the cheaper option out.

Squeaks, Shims and Construction-Grade Stringers

Carpet hides a lot of movement, and taking it off often reveals a flight that has squeaked for years under the padding. With the treads off we can shim, re-glue and block from the front; where the underside is open we can fix it from behind, which is better. Dealing with it while the staircase is apart costs a fraction of coming back for it later.

Matching Stairs to the Floor They Land On

Species, Grade and Board Width

A staircase in a different species from the floor it meets reads as an accident rather than a choice. We match species and grade first — white oak at 1360 Janka, red oak, hickory at 1820 Janka or maple, depending on what the field is — and build treads that carry the same board width and grain character. Traffic on stairs is concentrated, so species hardness matters more here than in a bedroom.

Sheen, Stain and Finishing With the Field

Color and sheen are where a close match becomes an exact one. Finishing treads on site alongside the adjacent floor means the same stain, the same sealer and the same coats land on both, so they equalize rather than approximate. Where the schedule demands prefinished treads, we select against a sample of the actual floor in the actual light rather than from a chart.

Bullnose, Reducers and the Landing

The transitions are where stair work is judged. A bullnose at a landing edge, a reducer where the floor meets something thinner, a threshold at a doorway on the landing — each is a detail that either lines up with the run of the floor or fights it. We set those out before installation so the joinery is deliberate instead of resolved with trim at the end.

Refinishing an Existing Staircase

Sanding Treads Without a Drum Sander

A drum sander cannot reach a stair tread, so stairs are sanded with an orbital sander, smaller detail equipment and hand work into the corners and against the risers. That is why refinishing a staircase takes disproportionate labor for its area. It is also why stair refinishing is skipped by contractors who price floors by the square foot and would rather not.

Lead-Safe Work on Painted Components

Painted risers, skirt boards, balusters and newel posts in pre-1978 housing put stair sanding inside the EPA RRP lead-safe rule once the work passes the six square foot minor repair threshold. Containment, HEPA cleanup and cleaning verification under 40 CFR 745 Subpart E are part of the job, worked to lead-safe practices, and the containment goes up where you can see it.

Working Around a Staircase in Use

A flight can often be done in halves or in alternating steps so the household keeps a route upstairs, at the cost of a longer schedule. Where the house has a second stair, the work goes faster. We tell you which of those your layout supports at the estimate, because it changes both the price and the number of days the house is disrupted.

Our Step-by-Step Hardwood Stairs Process

Step 1: Measure Every Step

Rise and run are taken at each step, not once. Inconsistency decides between retrofit treads and full replacement, and finding it after material is ordered is the expensive way to learn it.

Step 2: Look Under the Covering

Carpet comes back at one step so we can see the substrate, the fastener damage and whether anything refinishable is hiding under it before a quote is written. That single step decides between three very different prices.

Step 3: Stage the Access

We agree how the household keeps a route between floors, and where the house was built before 1978 the lead-safe containment plan is set at the same time. Both are decided at the estimate rather than on the first morning.

Step 4: Fit the Joinery

Treads, risers, nosings, returns and skirt boards are cut and fitted individually, squeaks are blocked and wedged while the flight is open, and the balustrade is addressed before finishing starts.

Step 5: Finish With the Floor

Where the field is site-finished, the stairs are stained and coated with it so color and sheen match rather than approximate. The written cure and occupancy schedule covers the stairs separately, because they come back into use first.

  • 20+ Years Experience
  • Dustless Containment
  • Free Written Estimates

Good to know

Frequently Asked Questions

Why are stairs priced per step rather than per square foot?

Because a staircase is joinery, not surface area. Every step is a tread, a riser, a nosing and usually a return on one or both ends, each cut and fitted individually to a run that is rarely perfectly square. Winders, landings, open sides and balustrade work each add their own labor. Square footage cannot see any of that, which is why a per-step or per-flight figure is the only honest way to quote it.

What is under our carpeted stairs?

Usually construction-grade stringers and plain framing lumber treads that were never meant to be seen, because the builder knew carpet was going over them. Sometimes there is oak underneath worth refinishing. We pull carpet back at one step to find out before quoting, since the answer decides between refinishing what is there, capping it with retrofit treads, or replacing the treads and risers outright.

Can hardwood stairs match a floor that is already down?

That is the normal goal and it takes four things agreeing: species, grade, sheen and the nosing profile at the front edge. Treads are thicker than flooring boards, so a tread is usually milled or built up rather than cut from the same product. On a site-finished floor we stain and coat the stairs with the field so the color equalizes across both, which is the part that makes them read as one installation.

Why do our stairs squeak, and can that be fixed?

A stair squeak is a tread moving against a stringer or a riser, usually where the original glue blocks let go or the fasteners loosened. Where the underside is open — a basement stair or an unfinished area below — it is fixable from behind with blocks and wedges, which is the best outcome. Where it is closed in, the repair comes from the top during the tread work. We check for access before quoting.

Can we still use the stairs while you work on them?

Partly, and it needs planning because a staircase is often the only route between floors. Work is commonly staged so alternating steps are usable, or done in halves so one side of a run stays walkable. It is slower than doing the whole flight at once and it is frequently worth it. We agree the staging before the schedule is set rather than discovering the problem on the first morning.

Do painted risers and balusters change how the job is done?

In a house built before 1978, yes. Sanding painted components is exactly the activity the EPA RRP lead-safe rule covers once the work passes the six square foot minor repair threshold, so it runs to lead-safe work practices, with containment, HEPA cleanup and cleaning verification to 40 CFR 745 Subpart E. About a third of this city's housing units date from 1950 to 1979, so it is a routine part of stair work here.

Should the treads be prefinished or finished on site?

Prefinished treads go in cured and take traffic immediately, which suits a household that cannot give up the staircase. Site-finished treads are sanded and coated with the adjacent floor, which is the only way to guarantee the color and sheen match exactly rather than closely. If the stairs land into a site-finished floor, finishing them on site is usually the right answer.